Avondale and Waterview wastewater improvements projects

Working to stop overflows in the Avondale and Waterview areas.

Duration

Estimated to start 2026/2027

Location

Avondale and Waterview

Status

Planning

Get regular updates

The latest

Geotechnical investigations from November

  • Our contractor will be doing geotechnical investigations in the community between November and early 2025. Investigations will take place in reserves and at locations along the proposed tunnel alignments.
  • These geotechnical investigations are required to add to our knowledge of soil, geology, and groundwater conditions for these projects.
  • In some cases, traffic management will be in place. We will keep residents updated.

Project overview

These projects form part of our broader Western Isthmus Water Quality Improvement Programme (WIWQIP) of works which is a joint initiative between us and Auckland Council. It's aimed at reducing wastewater overflows and improving stream and beach water quality across the city’s central western isthmus.


The proposal

  • The construction of new wastewater pipes that will cater for growth whilst reducing the frequency and extent of overflows.
  • The pipes will transport overflows from several areas to the Central Interceptor. The proposed pipeline will connect at various locations to the existing network and discharge to the Central Interceptor project at the downstream end. It will improve the collection and conveyance of wastewater and minimise the occurrence of spills and uncontrolled overflows that occur in the Avondale and Waterview catchments.

Please refer to the maps for the proposed works areas.